Collection of photos of the construction of Plavinas HES on the river Daugava
This construction took place in 1961-1966. Nowadays this Plavinas HES is the biggest in capacity (868,5 mwt) in the Baltics and the second in the European Union.
The photo album is prepared by Andrey Zuev.